The bottle neck needed to be addressed not only to handle existing supply, but anticipated growth. Dry Empire would, after-all, move beyond the system to neighboring stars in the future and this would require growing raw material processing to meet demand for construction materials, fuels, weaponry, hulls, food stuffs, and a host of other products.
To convert such large quantities of raw materials into usable resources required a processing plant of a quantitatively higher order.
One of the mining outposts built nearer to Dry Station was selected as the base platform, and a design was chosen for a separate linked processing platform being produced while the mining outpost's existing infrastructure was used as a logistics and work platform during the construction process. Ultimately it would be modified and included in the overall design, but during the initial stages of construction the 3 man mining outpost was used to house work crews, organise the details, store supplies, deal with shipping traffic, etc.
FRG Thor was designated to oversee the construction, a good indicator of its value to Chairman Broez.
![]() |
The empire's most powerful vessel is assigned to escort the station during construction. |
![]() |
One of the Pisces Class generator modules being moved into position. |
![]() |
CRV Alannis occasionally visits the site to buffer defenses as construction continues. |
![]() |
A battery of 8 Pisces-Class triple generators (three sets of 3x3x3 per Pisces) will provide the processing plant with power generation to dwarf even FRG Thor's power matrix. |
The processing plant has a few key components, being:
- 2 large matter signature storage cryovats
- Matter conversion battery
- Battery of energy storage cells
- Battery of Pisces Class 3x3x3 (x3) energy generators
- Central processing AI unit
- Central processing and habitation module
- WDU rack
- Fluids purification plant (life support module)
- Shuttle Bay
- Observation port
- Traffic Control Tower
- Logistics area (wharf and cargo container storage area)
- Defense matrix (specifications currently classified)
![]() |
The human areas are some of the last zones to be completed, followed by the shuttle bay and the logistics area. |
![]() |
Processing Plant "Fieldberg Station" during the final stages of construction. |
The final stages of the habitation facility will allow the crew to move in, the modification of the original mining outpost, and will greatly accelerate the final stages of Fieldberg's construction.
No comments: